menu
Resources/แหล่งข้อมูล


 
 International Standards NACE

Standard Number
Description
Notes
Date
NACE RP propo 97
Dehumidification and temperature control during surface preparation, application and curing of coatings/linings for tanks, vessels and other enclosed spaces
DRAFT - Relationship between air temperature, humidity and temperature.
1997
NACE RP0188-88 Discontinuity (Holiday) Testing of Protective Coatings Low and high voltage equipment and tests.
1990
NACE RP0274 High Voltage Electrical Inspection of Pipeline Coatings Prior to Installation DC or Pulsed kit. Volts = 1250 x SQR(mils).
1974
NACE RP0490-90 Holiday Detection of Fusion-Bonded Epoxy External Pipeline Coatings of 10 to 30 Mils (0.25 to 0.76 mm) Use DC system in dry conditions or Pulsed type in damp conditions. Calculate V = 525 x SQR(T mils). Trailing ground lead of 9m is allowed provided pipe is connected to 2-3ft earth spike and soil is not dry. Otherwise, connect both earths.
1990

>>Back<<

Copy Right By AMET Co., Ltd
Contact Webmaster sales@amet.net